欢迎访问中国社会科学院大学浙江高等研究院(浙江财经大学-中国社会科学院大学浙江研究院)!

  • 学校主页
  • 加入收藏
所在位置: 首页 > 关于我们 > 教授
林剑
学历:研究生
学位:博士
联系方式:linjian1001@126.com
办公地点:行政楼216
研究方向:智能计算、调度管理、运筹优化
意向交叉学科:应用经济学/金融/公共管理
学历 学历:研究生 学位 学位:博士
联系方式 联系方式:linjian1001@126.com 办公地点 办公地点:行政楼216
研究方向 研究方向:智能计算、调度管理、运筹优化 意向交叉学科 意向交叉学科:应用经济学/金融/公共管理

代表性论文:

Yang-Yuan Li, Jian Lin, Zhou-Jing Wang. Multi-skill resource constrained project scheduling using a multi-objective discrete Jaya algorithm [J]. Applied Intelligence, 2021, doi:10.1007/s10489-021-02608-8. (SCI)

Hongbo Song, Jian Lin. A genetic programming hyper-heuristic for the distributed assembly permutation flowshop scheduling problem with sequence dependent setup times [J]. Swarm and Evolutionary Computation, 2021(60): 100807. (SCI)

Jian Lin, Lei Zhu, Kaizhou Gao. A genetic programming hyper-heuristic approach for the multi-skill resource constrained project scheduling problem [J]. Expert Systems With Applications, 2020, 140: 112915. (SCI)

Lei Zhu, Jian Lin, Zhou-Jing Wang. A discrete oppositional multi-verse optimization algorithm for multi-skill resource constrained project scheduling problem [J]. Applied Soft Computing, 2019, 85: 105805. (SCI)

Jian Lin, Lei Zhu, Zhou-Jing Wang. A hybrid multi-verse optimization for the fuzzy flexible job-shop scheduling problem [J]. Computers & Industrial Engineering, 2019, 127: 1089-1100. (SCI)

Jian Lin, Zhou-Jing Wang. Multi-area economic dispatch using an improved stochastic fractal search algorithm [J]. Energy, 2019, 166: 47-58. (SCI)

Jian Lin. Backtracking search based hyper-heuristic for the flexible job-shop scheduling problem with fuzzy processing time [J]. Engineering Applications of Artificial Intelligence, 2019, 77: 186-196. (SCI)

Jian Lin, Zhou-Jing Wang, Xiaodong Li. A backtracking search hyper-heuristic for the distributed assembly flow-shop scheduling problem [J]. Swarm and Evolutionary Computation, 2017, 36: 124-135. (SCI, SSCI)

Jian Lin, Zhou-Jing Wang. Parameter identification for fractional-order chaotic systems using a hybrid stochastic fractal search algorithm [J]. Nonlinear Dynamics, 2017, 90 (2): 1243-1255. (SCI)

Jian Lin, Shuai Zhang. An effective hybrid biogeography-based optimization algorithm for the distributed assembly permutation flow-shop scheduling problem [J]. Computers & Industrial Engineering, 2016, 97: 128-136. (SCI)

Jian Lin. A hybrid discrete biogeography-based optimization for the permutation flow shop scheduling problem. International Journal of Production Research, 2016, 54(16): 4805-4814. (SCI)

上一条:武鑫 下一条:罗俊

关闭